Public laboratory ledger / observation-time view

Work in public.
Claim only when earned.

This page separates activity from evidence. It shows what is running, what is reproducible, and which gates still prevent a terminal scientific claim—without publishing operational or account data.

Clean games300across both cohorts
Active suites3collection in progress
Evidence gates4/12passed, fail-closed
Release inventory90%381 of 421 present

Collection

Evaluation host

running
Completed runs
29 / 32
Persisted provider errors
0
Evidence cutoff
Aug 6, 2026, 1:32 AM UTC
Inspect protocol results

Release engineering

Evidence bundle

gated
Artifacts present
381
Missing terminal artifacts
40
Release graph
reachable
Structural blockers / self-cycles
0 / 0
Public-content secret findings
0

The publication graph is structurally reachable; the bundle remains gated until its terminal evidence exists and passes every scientific gate.

Open the Claim Observatory

Submission contract

Twelve gates. No silent promotion.

01

The strongest currently admissible form is living methods and observation working paper. A green engineering check is not automatically a green scientific claim.

S01passed

Frozen Luna discovery evidence

Evidence verified
S02passed

Manuscript claim boundary

Evidence verified
S03passed

Claims and reviewer ledgers present

Evidence verified
S04open

Terminal evaluation host

fatal if open
S05open

Contract-v3 content-addressed terminal DeepSeek freeze

fatal if open
S06open

Terminal DeepSeek protocol rating

major if open
S07open

Request-level billing attribution or fail-closed unavailable result

major if open
S08open

Joint E000/E001 leakage qualification and label eligibility

fatal if open
S09open

Paired mechanism outcomes

fatal if open
S10passed

Draft evidence bundle

Evidence verified
S11open

Publication evidence bundle

fatal if open
S12open

Paid budget consent and provider-qualified A105 route

fatal if open

Recent reproducibility work

The infrastructure is part of the result.

02
  1. Paid Experiment And Terminal Release Contracts Hardened And Complete Evidence Graph Registeredverified milestone
  2. Real Paired Experiment Execution Path Is Fail Closed Resumable And Release Registeredverified milestone
  3. Public Status Separates Release Graph Reachability From Missing Scientific Evidenceverified milestone
  4. Public Status Projects The Repaired Release Graph On Chessreasoning Orgverified milestone
  5. Paired Execution Gates And Publication Graph Are Fail Closed And Structurally Reachableverified milestone
  6. Public Laboratory Status Is Privacy Safe And Live On Custom Domainverified milestone
  7. Terminal Tracking Dictionary Is Two Freeze Bound And Schema Validatedverified milestone
  8. Terminal Rating Uncertainty Is Two Freeze Bound And Raw Reconciledverified milestone